Project Features
- Slipform annex structure that will house 1.8 million bushels.
- Dual 20,000 BPH receiving systems. Pits are designed to hold over 1,000 bushels.
- Dual 20,000 BPH reclaim system that allows for transferring to drying bins or rail loadout at 40,000 BPH.
- Other Features:
- Fully computerized material routing systems.
- 1/10 CFM/BU aeration system.
- Scalping system.
- Allowances for future cleaning and drying systems.