Services Hub

Comprehensive Industrial Construction Services

From early-stage feasibility through plant startup, Todd & Sargent delivers fully integrated design, engineering, and construction services for agricultural and industrial facilities across North America. One team. One contract. Total accountability.

Our Capabilities

Every Phase. One Partner. Exceptional Results.

Todd & Sargent’s in-house team of licensed engineers, experienced project managers, and skilled field crews enables a seamless single-source approach that reduces risk, compresses schedules, and delivers facilities that perform from day one. Founded in 1933 and headquartered in Ames, Iowa, we have spent over 90 years building the grain, feed, flour, pet food, oilseed, biofuel, and other industrial processing facilities that feed and fuel North America. As a leading design-build contractor for the agricultural and industrial processing sectors, we provide the full spectrum of services required to take a project from concept to operational reality.

Design-Build

Single-source project delivery combining engineering, design, and construction under one contract. Fixed accountability, faster schedules, and cost certainty for agricultural and industrial facility projects across the U.S. and Canada.

Engineering & Design

In-house structural engineering by licensed professional engineers — designed for constructability, code compliance, and long-term operational performance.

Pre-Construction

Feasibility studies, site analysis, preliminary budgeting, master scheduling, and permitting support that sets your project up for success before a single dollar is spent on construction.

Project Management & Procurement

Expert project oversight, strategic material procurement, CPM scheduling, and rigorous cost control that keeps your project on time, on budget, and fully transparent throughout construction.

Construction Services

Self-performing general contractor with specialized crews in slipform concrete, structural steel, mechanical installation, and civil construction — the trades that matter most on agri-industrial projects.

Commissioning & Startup

Systematic pre-commissioning inspections, functional testing, controls verification, and operator training that ensures your facility reaches full production capacity safely and on schedule

Specialty Services

Advanced capabilities including slipform concrete construction — a T&S specialty since 1969 — and precision industrial millwright services for complex equipment installation across grain, feed, flour, pet food, oilseed, biofuel, and other industrial processing facilities.

What Is Design-Build?

One Contract. One Team. Complete Accountability.

The design-build delivery method unifies engineering, design, and construction under a single contract with Todd & Sargent. Unlike traditional design-bid-build procurement, there is no contractual gap between your designer and your contractor — we are both.

For owners of grain elevators, feed manufacturing plants, flour mills, pet food production facilities, oilseed processing plants, biofuel facilities, and other industrial complexes, design-build means a single point of contact, a single integrated schedule, and one team fully accountable for your project’s outcome. Our in-house licensed engineers and experienced field crews collaborate from day one — catching constructability issues before they become expensive change orders.

Todd & Sargent has delivered design-build projects across the U.S. and Canada for more than 90 years — since our founding in Ames, Iowa in 1933. Our integrated team is uniquely positioned to self-perform the engineering, design, and construction phases of complex industrial facilities.

Key Advantages

Faster Project Delivery

By overlapping the design and construction phases, Todd & Sargent’s design-build projects are delivered substantially faster than the traditional design-bid-build method — without sacrificing quality, compliance, or long-term facility performance.

Cost Certainty & Reduced Risk

A single contract means one budget, one schedule, and one team responsible for the outcome. The most common source of cost overruns — conflicts between the designer and the contractor — is eliminated entirely.

Constructability by Design

Our engineers design with construction in mind from the first sketch. Every structural and process decision is reviewed by the field-experienced professionals who will build it — minimizing RFIs and costly late-stage design revisions.

The Todd & Sargent Design-Build Process

Our six-phase process guides every design-build project from the earliest concept conversation through construction completion and plant startup — maintaining full owner transparency at every milestone.

01

Discovery & Feasibility

We begin with a deep dive into your operational goals, site conditions, budget parameters, regulatory environment, and production targets. Our team conducts site visits, geotechnical investigations, and utility assessments to establish project viability and identify potential risks before any design investment is made.

02

Concept Design & Budgeting

Our in-house engineers develop conceptual facility layouts, process flow diagrams, and equipment lists tailored to your production requirements. Simultaneously, our estimating team builds a preliminary budget tied directly to the design — so you have real cost data as design decisions are made, not after the fact.

03

Design Development & Permitting

We advance the design through schematic and design development phases, incorporating your feedback at every milestone. Our team identifies and manages all required permits — building, environmental, stormwater, air quality — and coordinates with local, state, and federal authorities to minimize permitting delays.

04

Construction Documents & Procurement

Final PE-stamped construction drawings are completed by licensed professional engineers. Long-lead equipment and structural steel are procured strategically to protect your schedule and lock in pricing. Our procurement team leverages long-standing supplier relationships for competitive sourcing.

05

Field Construction

Our self-performing field crews execute construction with safety-first discipline, using daily reporting, weekly schedule updates, and real-time cost tracking to keep your project transparent. Slipform concrete, structural steel erection, mechanical installation, and electrical work are all managed under one team.

06

Commissioning & Startup

Before turnover, our commissioning team systematically tests every system, verifies all controls and safety interlocks, assists in training your operations staff, and documents baseline performance parameters. Your facility is delivered ready for full-scale production from the first day of operations.

Why Industrial Owners Choose Design-Build

Single Point of Contact

One team, one contract, and one phone number. No finger-pointing between your designer and your contractor. Todd & Sargent owns the entire project outcome and stands behind every decision made from concept to commissioning.

Collaborative Problem-Solving

When challenges arise — and they always do on complex industrial projects — our integrated team solves them internally and quickly, preventing the costly delays and change orders that plague traditionally procured projects.

Constructability Built In

Our engineers design with construction in mind from day one. Every structural connection, every equipment clearance, and every sequencing decision is reviewed by field-experienced professionals before the drawings are issued for construction.

Real-Time Value Engineering

Early integration of cost and schedule data into the design allows our team to identify cost-saving alternatives without compromising your facility’s operational performance, longevity, or safety compliance.

Reduced Administrative Burden

Managing a single design-build contract is dramatically simpler than coordinating separate engineering and construction contracts. Your team can stay focused on running your business while we manage the project.

Proven for Ag-Industrial Projects

Design-build is especially well-suited to grain elevators, feed mills, biofuel facilities, and agri-industrial plants where process complexity, specialized equipment, and tight operational windows demand tight coordination between design and construction.

Design-Build FAQs

What types of facilities does Todd & Sargent build using design-build?

Todd & Sargent delivers design-build projects for grain storage and handling facilities, commercial grain storage, feed manufacturing plants, pellet mill facilities, flour mills, pet food manufacturing plants, oilseed processing facilities, corn milling facilities, ethanol and biofuel plants, bulk material handling systems, and other industrial facilities.

In design-build, a single entity holds both the design and construction contracts and is fully responsible for both design quality and construction outcome. In CM at-risk, a construction manager takes on cost risk but typically the owner still holds the design contract. Design-build provides the cleanest single-source accountability.

Yes. Todd & Sargent is licensed in multiple U.S. states and holds construction licenses across Canada through Todd & Sargent Canada, Ltd., our Canadian subsidiary headquartered in Winnipeg, Manitoba. Our engineers are licensed Professional Engineers in the states and provinces where our projects are located.

Todd & Sargent typically begins with a preliminary budget tied to a conceptual design, then transitions to a Guaranteed Maximum Price (GMP) or lump-sum contract once the design reaches sufficient detail. This approach gives owners early cost visibility while protecting against final price surprises.

Engineering Capabilities

Full-Spectrum In-House Engineering Expertise

Todd & Sargent’s engineering department is one of the most experienced in the agri-industrial construction industry. Our licensed professional engineers provide design services tailored to the unique structural, process, and regulatory demands of grain, feed, flour, pet food, oilseed, and industrial processing facilities — and they work alongside the crews who build what they design.

Structural Engineering

Design of reinforced concrete, structural steel, and composite structural systems for the projects we construct. All designs are PE-stamped and code-compliant per IBC and applicable state and provincial standards. Our structural team holds deep expertise in slipform concrete construction — first applied at Ceres Land Company in Sterling, Colorado in 1969 and refined over hundreds of structures since.

Process Engineering

Process flow diagrams (PFDs), equipment sizing, material balance calculations, capacity analysis, and system integration design for grain handling, feed manufacturing, flour milling, pet food processing, oilseed extraction, biofuel production, and bulk material handling systems. We engineer for maximum throughput, energy efficiency, and operational reliability.

Civil Engineering

Site grading and drainage design, stormwater management plans, pavement design, underground utility coordination, and shallow/deep foundation engineering. Our team maintains strong working relationships with state, provincial, and local permitting authorities to streamline regulatory approvals.

Mechanical Engineering

Mechanical system design for HVAC, industrial dust collection, pneumatic conveying, compressed air distribution, fire suppression, and process utility systems. Our team recommends systems for the harsh industrial environments found in grain, feed, flour, and processing facilities.

Drafting & BIM Coordination

Our team of skilled drafters and designers produce detailed, coordinated construction drawings using AutoDesk Softwares, such as REVIT, and industry-standard BIM tools. Drawings are cross-disciplinary coordinated to minimize field conflicts, reduce RFIs, and support accurate material take-offs during procurement.

Code Review & Regulatory Compliance

Every Todd & Sargent project undergoes rigorous internal code review. We navigate IBC, NFPA 61, NFPA 652, OSHA, EPA, and state- and province-specific regulations — including grain dust explosion prevention standards and food safety construction requirements — so your facility is built to meet or exceed all applicable codes.

Engineering Built for Construction

When your engineer and your contractor are the same company, constructability is baked into every design decision from day one.

At Todd & Sargent, our engineers work shoulder-to-shoulder with project managers, field superintendents, and estimators throughout the design phase. This means structural systems are designed the way our crews build them, equipment is specified with installation clearances in mind, and material costs are tracked in real time as the design evolves. The result is a design package that is accurate, efficient, and ready to build — with fewer RFIs, fewer change orders, and fewer field conflicts.

All structural, civil, and mechanical drawings are signed and sealed by licensed Professional Engineers registered in the states and provinces where our projects are located. Our engineering team maintains PE licenses in Iowa, Minnesota, Nebraska, Kansas, South Dakota, North Dakota, Missouri, and several Canadian provinces.

Industries We Engineer For

Commercial grain elevators and terminals

Grain storage bins, flat storage, and drying systems

Feed manufacturing plants and pellet mill facilities

Flour mills and dry grain milling operations

Pet food manufacturing facilities — dry extrusion and wet retort

Oilseed processing and crushing plants

Corn milling facilities — dry milling, wet milling, and masa production

Biodiesel, ethanol, and cellulosic biofuel facilities

Bulk material handling and conveying infrastructure

Fertilizer blending and agri-input storage facilities

Industrial processing and chemical manufacturing

Cement storage silos, clinker storage, and cement plant infrastructure

Engineering Services FAQs

Does Todd & Sargent provide standalone engineering services, or only as part of design-build?

Todd & Sargent primarily delivers engineering as part of integrated design-build projects. However, we do discuss specific engineering support arrangements on a case-by-case basis. Contact our team to discuss your project requirements.

We design to IBC (International Building Code), AISC (steel), ACI (concrete), and applicable state building codes. For grain and agricultural facilities, we also follow ASABE standards for bin and silo design and NFPA 61/652 for dust explosion prevention.

Yes. Our Professional Engineers maintain registrations in multiple US states and Canadian provinces. For projects in additional jurisdictions, we apply for reciprocal PE licensure as needed.

Why Pre-Construction Matters

Decisions Made Early Cost Less Later

Industry research consistently shows that 80% of a project’s total cost is determined in the first 20% of the project timeline. Todd & Sargent’s preconstruction services front-load the intelligence, planning, and collaboration that drives better outcomes throughout every subsequent phase of your project.

Feasibility Studies

We evaluate the technical, regulatory, and economic viability of your proposed facility or expansion — including site suitability, utility availability, environmental constraints, zoning requirements, and rough-order-of-magnitude budgeting — before you commit to full-scale development.

Site Analysis & Selection

Our engineers and partners assess candidate sites for soil conditions, bearing capacity, drainage patterns, access road requirements, utility infrastructure, zoning compliance, and proximity to rail, road, and water transportation. We help you choose the right site for long-term operational efficiency.

Preliminary Budget Development

Using historical data from hundreds of industrial construction projects across the U.S. and Canada, combined with current material pricing, labor rates, and equipment costs, we develop detailed preliminary budgets that give you realistic cost expectations and defensible project economics early in the decision process.

Master Project Scheduling

We develop comprehensive master project schedules identifying critical path activities, long-lead procurement items, seasonal construction windows, and regulatory timeline dependencies. Knowing your schedule constraints before design is complete is essential for protecting your operational startup target date.

Permitting & Regulatory Support

Our team identifies required permits — building, environmental, stormwater, air quality, dust management, and utility — and develops a permitting strategy calibrated to your project timeline. We coordinate with authorities having jurisdiction, in both the U.S. and Canada, on your behalf.

Value Engineering

Pre-construction is the highest-leverage phase for value engineering. Our integrated team of engineers, estimators, and project managers reviews every design concept for cost-efficiency opportunities and constructability that preserve function and performance while reducing capital cost.

Pre-Construction Deliverables

What You Receive from Our Pre-Construction Phase

Every Todd & Sargent pre-construction engagement produces a defined set of deliverables that give project owners the information they need to make confident go/no-go and design decisions.

Site evaluation report and geotechnical investigation summary

Conceptual facility layout and preliminary process flow diagrams

Detailed preliminary project budget with line-item breakdown

Master project schedule with milestones and critical path identification

Permit identification matrix and regulatory submission strategy

Long-lead equipment and structural steel procurement plan

Utility and infrastructure assessment report

Value engineering options and alternatives analysis

Risk register with probability ratings and mitigation strategies

Project delivery method recommendation (design-build vs. design-bid-build)

Regional workforce and subcontractor availability analysis

Preliminary construction phasing and logistics plan

Pre-Construction FAQs

When should I engage Todd & Sargent for pre-construction services?

The earlier the better. Pre-construction services are most valuable when engaged during the project evaluation phase, before significant design or financial commitments have been made. Even a preliminary feasibility study can save significant cost by identifying site, regulatory, or budget issues before they become expensive problems.

Pre-construction engagements are structured as separate agreements. Many owners use our pre-construction services to validate project viability and develop a budget, then proceed to a design-build or construction contract with us. We are transparent about this flexibility from the beginning.

A pre-construction phase for a new grain or feed facility typically takes 4–12 weeks depending on scope. Simple feasibility studies can be completed faster. Projects requiring extensive site analysis, geotechnical investigation, or complex regulatory review may take longer.

Project Communication

The primary means of reporting on the various aspects of project progress and status is through weekly team meetings.  In those meetings, project progress, the procurement process, and design efforts will be reviewed with the T&S team members, Lincoln Premium Poultry stakeholders, and subcontractors. As the project moves into the construction phase, we will review current work progress and preview construction activities planned for the upcoming weeks. Any issues related to aspects of the project will be addressed at these meetings. 

Todd & Sargent leverages Autodesk Forma (formerly Autodesk Construction Cloud) as a project management platform. This system is utilized for accessing relevant project files and for certain communications, including sending billing and change orders (if applicable). The docs module also provides a single source of truth for all project documents, drawings, and models accessible to all team members across different disciplines. Through robust file sharing, there is real-time collaboration between designers, engineers, contractors, and owners regardless of location. The T&S team is proud to use this system to streamline workflows and processes to save time, money, and deliver a great finished product to our clients.

Project Communication

Disciplined Management of Every Project Variable

At Todd & Sargent, project management is not a support function — it is the backbone of our delivery model. Our project managers are empowered, experienced professionals who are fully accountable for delivering every project on time, within budget, and to the quality standards your operation demands.

01

Project Planning & Kickoff

Upon contract execution, our PM team establishes the project baseline: a detailed CPM schedule, budget breakdown structure, communication plan, quality management plan, and project risk register. A formal kickoff meeting aligns all internal teams, subcontractors, and the owner’s team before work begins.

02

Material Procurement & Supply Chain Management

Our procurement team leverages decades of supplier relationships across the structural steel, process equipment, concrete materials, and mechanical component markets. We pre-purchase long-lead items — conveyors, bucket elevators, dryers, bins — strategically to protect your schedule and lock in pricing before market escalation.

03

Schedule Management

We use CPM scheduling to manage project timelines, update and distribute schedules weekly, and proactively identify schedule risks before they impact your startup date. Every owner receives regular schedule status updates with a clear view of critical path activities, float consumption, and look-ahead plans.

04

Cost Control & Financial Reporting

Real-time cost tracking against the project budget is maintained throughout construction. Owners receive detailed monthly cost reports, cash flow forecasts, and change order logs — so there are never financial surprises at project close. Our commitment: full financial transparency throughout your project.

05

Quality Assurance & Control

Our QA/QC program includes documented inspection and hold points, third-party materials testing where required, daily quality documentation by our field teams, and regular quality review meetings with the owner.
Every subcontractor on a T&S; project is prequalified and held to our quality standards.

06

Closeout & Structured Handover

Project closeout is a disciplined process: systematic punch list completion, as-built drawing delivery, operations and maintenance manual assembly, equipment warranty documentation, and a structured handover meeting with your operations and maintenance team.

90+

Years in Operation

500+

Completed Projects

100%

Owner Transparency

<1%

Industry-Low Change Order Rate

Strategic Procurement for Agri-Industrial Projects

Material and equipment procurement represents 40–60% of the total cost of most agri-industrial construction projects. Todd & Sargent’s procurement team brings market knowledge, supplier relationships, and strategic sourcing discipline that directly improves your project economics.

Long-Lead Equipment Strategy

Grain dryers, bucket elevators, pellet mills, air handling systems, and structural steel all have extended lead times that can define your project schedule. We identify long-lead items early and procure them strategically
— keeping your schedule on track.

Structural Steel Sourcing

Our team has long-standing relationships with fabricators across the Midwest, giving us competitive pricing, reliable delivery commitments, and quality assurance on the structural steel that forms the backbone of your facility.

Process Equipment Procurement

We source process equipment from industry-leading manufacturers for grain, feed, flour, and biofuel applications — including conveying equipment, processing machinery, dust collection systems, and controls packages.

Subcontractor Management

Specialty subcontractors — electrical, controls, fire protection — are prequalified, competitively bid, and managed to the same schedule and quality standards as our own crews.

Material Cost Control

Real-time material cost tracking against budget ensures that procurement decisions are always made with full awareness of budget impact. We flag scope and market changes before they become surprises.

Owner Transparency

All procurement activities, vendor selections, pricing, and delivery commitments are documented and shared with the owner. You always know where your money is going and when materials will arrive.

Construction Capabilities

Expert Self-Performance Across Every Critical Trade

Unlike construction managers who subcontract the core work, Todd & Sargent self-performs the construction scopes that matter most on industrial projects. This gives us direct control over quality, schedule, and safety — and gives you a contractor who is fully accountable at the work face.

Concrete Construction & Slipform

From shallow spread footings and equipment pads to massive grain bins and concrete silos, our crews are experts in all forms of industrial concrete construction. Our signature specialty is slipform concrete — a continuous-pour technique we first applied at Ceres Land Company in Sterling, Colorado in 1969. In the 55+ years since, we have constructed hundreds of slipform structures across grain elevators, feed mills, flour mills, industrial storage, and cement facilities throughout the U.S. and Canada.

Structural Steel Erection

Our experienced crews erect structural steel frames, conveying galleries, head houses, transfer towers, and support structures for industrial facilities across the U.S. and Canada. We manage steel fabrication through trusted suppliers and self-perform erection with experienced crews equipped with modern crane and lifting equipment.

Mechanical & Millwright Construction

Equipment setting and alignment, process piping, dust collection systems, and pneumatic conveying are self-performed by our millwright and mechanical crews. We specialize in installing the complex processing equipment found inside grain, feed, flour, pet food, oilseed, and industrial processing facilities.

Site & Civil Construction

Our crews manage complete site preparation including earthwork, underground utilities, concrete paving, stormwater infrastructure, and site drainage. Coordinating civil construction in-house allows tighter schedule control and eliminates interface risk between civil and structural scopes.

Safety First, Always

An Uncompromising Safety Culture

At Todd & Sargent, safety is not a compliance program — it is a core value lived every day on every jobsite by every member of our workforce.

Our field teams operate under a comprehensive safety management system that meets and exceeds OSHA requirements for industrial construction. We maintain a full-time dedicated safety team that conducts daily pre-task safety planning, regular unannounced field audits, and ongoing workforce safety training and certification.

Every subcontractor working on a Todd & Sargent project must meet our safety prequalification standards before setting foot on site. Our subcontractor safety orientation process, drug and alcohol testing program, and ongoing compliance monitoring ensure a consistent safety culture across the entire project workforce.

Our industry-low Experience Modification Rate (EMR) reflects our commitment to sending every worker home safely every day — a performance record that demonstrates our safety discipline to owners, insurers, surety companies, and regulatory agencies.

Daily pre-task planning (PTP) by all crews before work begins

Full-time dedicated on-site safety professionals

OSHA 30-hour certification required for all superintendents

Comprehensive subcontractor safety prequalification program

Regular unannounced safety audits and near-miss reporting culture

Drug and alcohol testing program for all site personnel

Comprehensive fall protection, confined space, and hot work programs

Emergency response plan for every project before mobilization

Industry-low EMR demonstrating sustained safety performance

What Is Industrial Commissioning?

The Bridge Between Construction and Production

Commissioning is the structured, systematic process of verifying that all systems in a newly constructed or renovated facility are correctly installed, operate according to design specifications, and are ready for safe, full-scale production. It is the critical final step that transforms a construction project into a productive operational asset — and it is where many facilities stumble without the right commissioning partner.

Pre-Commissioning Walkdowns

Before any system is energized, our commissioning team conducts detailed pre-comm walkdowns to verify all equipment is installed per design drawings, all connections are correctly made, safety devices and guards are in place, and all pre-startup punch list items are resolved. No shortcuts. No assumptions.

System Functional Testing

Each process system is tested systematically — starting with individual equipment run-in tests, progressing to integrated system tests, and culminating in full-throughput production trials with product flowing through the facility. All test results are documented against design performance criteria.

Controls & Automation Verification

PLC programs, HMI configurations, and automation sequences are verified by our technical team alongside the controls integrator. We confirm that all process controls, interlocks, and safety shutdown sequences operate correctly under all foreseeable operating conditions before product enters the facility.

Operator Training & Procedure Development

Our commissioning team provides hands-on training for your operations staff on all major systems, process equipment, and control interfaces. We develop or review operations and maintenance procedures and ensure your team is fully confident running the facility independently before we leave the site.

Performance Documentation & Baseline

We document baseline operating parameters — throughput rates, energy consumption, dust emissions levels, equipment operating temperatures, and vibration data — providing your team with a performance baseline for ongoing monitoring, predictive maintenance, and future optimization.

Post-Startup Support

Todd & Sargent remains engaged after handover during the early production period. We are available to troubleshoot startup issues, support your operations team during the learning curve, address warranty items, and provide technical guidance as your team builds operational proficiency.

Why Commissioning Done Right Pays for Itself

A facility that doesn’t start up smoothly doesn’t just frustrate your team — it destroys the financial model that justified the capital investment.

Every week of delayed startup on a new grain elevator, feed mill, or biofuel plant costs real money: missed crop marketing windows, delayed customer contracts, idle labor, and loan interest without revenue. Poor commissioning — rushed inspections, untrained operators, unverified controls — is one of the leading causes of delayed or troubled facility startups.

Todd & Sargent’s commissioning team brings 90+ years of hands-on experience starting up agri-industrial facilities of every size and type. We know where problems hide, what checks matter most, and how to train operators to run their new facility confidently from day one.

Systematic pre-commissioning checks that prevent energization incidents

Controls verification that prevents costly process upsets at startup

Operator training that reduces early-operation errors and equipment damage

Performance documentation that protects equipment warranties

Punch list closure that ensures all contracted scope is complete before handover

Post-startup support that keeps your team from being left alone during the learning curve

What Is Slipform Construction?

Continuous Concrete. No Cold Joints. Maximum Strength.

Slipform construction is a specialized concrete placement technique in which a continuously moving form system is used to pour concrete without stopping — producing a monolithic concrete structure with no horizontal construction joints, superior structural integrity, and the smooth, uniform wall finish that defines the world’s finest storage and processing structures.

Todd & Sargent completed its first slipform project in 1969 for Ceres Land Company in Sterling, Colorado — marking the beginning of a slipform construction program that has since produced hundreds of structures across the U.S. and Canada. Our slipform crews are among the most experienced in North America, with a continuous practice record spanning more than five decades.

Monolithic Construction – No Cold Joints

No cold joints means no structural weak points. Slipformed concrete structures are stronger than conventionally formed alternatives because the concrete is placed as a single continuous mass without horizontal construction joints where cracking and water infiltration can occur.

Faster Construction Timeline

The continuous nature of slipform construction means tall structures are completed in a fraction of the time required for conventional form-and-pour methods — often completing the concrete work on large grain bins in days rather than weeks.

Structures We Build with Slipform Concrete

Grain Storage

Slipform concrete grain storage from 30 to 105 feet in diameter and over 120 feet tall. Our structural engineers design bin geometry, wall thickness, and reinforcing to meet grain pressure loads, wind loads, and seismic requirements for every site and grain type.

Commercial Grain Elevators

Commercial elevator and terminal construction including concrete grain storage, working head house structures, and annexed storage bins. We deliver complete concrete elevator structures from foundation through roof, typically in a single continuous slipform operation.

Industrial Silos & Storage Structures

Concrete silos and storage structures for industrial materials including cement, clinker, lime, potash, fertilizer, feed ingredients, and other granular or powdered materials. Our engineering team sizes the structure for your specific material properties and loading conditions. Todd & Sargent’s slipform expertise is one of our primary entry points into the cement plant infrastructure market.

Elevator Legs & Working Houses

The heart of a grain elevator — the concrete working house that contains the leg pit, receiving area, and equipment level — is a slipform specialty. Our crews have constructed working houses for country elevators and major terminal facilities across the grain belt.

Multi-Bin Storage Complexes

Modern grain storage facilities often require multiple interconnected bins with complex tunnel and reclaim systems below grade. Todd & Sargent coordinates slipform bin construction with the underground civil work for efficient overall project delivery.

Specialty Concrete Structures

In addition to traditional grain facility structures, our slipform capabilities extend to industrial towers, process silos, stacking tubes, and other large-diameter concrete structures for specialty industrial applications.

The Case for Slipform Concrete Construction

Superior Structural Integrity

Monolithic concrete without horizontal cold joints provides superior resistance to the lateral and vertical loads imposed by stored grain, wind, and seismic forces. Concrete grain bins built by T&S; have proven service lives of 50–100 years with proper maintenance.

Optimal Use of Footprint

Concrete bins make excellent use of storage capacity per square foot of footprint, with vertical walls that maximize usable volume compared to peaked steel bins of the same diameter.

Low Long-Term Maintenance

Properly designed and constructed slipform concrete structures have far lower long-term maintenance costs than steel alternatives — no painting, no panel replacement, no bolt retightening programs.

Fire and Explosion Resistance

Concrete construction provides inherent fire resistance and structural integrity in the event of a grain dust deflagration — a significant safety consideration for commercial grain storage facilities.

Slipform Construction FAQs

When did Todd & Sargent begin slipform concrete construction?

Todd & Sargent completed its first slipform project in 1969 for Ceres Land Company in Sterling, Colorado. In the 55+ years since, the company has built hundreds of slipform concrete structures across the U.S. and Canada for grain, feed, oilseed, industrial, and cement storage applications.

We have constructed slipformed concrete grain storage bins exceeding 120 feet in wall height. The practical maximum height is determined by structural engineering requirements, site wind and seismic loads, and the grain type being stored.

The slipform concrete operation itself — from the first pour to the top of the walls — typically takes 3 to 10 days depending on wall height and diameter. Larger, taller structures take longer. The slipform pour runs 24/7 with rotating crews until complete.

Millwright Capabilities

Precision Installation for Complex Industrial Equipment

Industrial millwright work is among the most technically demanding in the construction industry. Todd & Sargent’s millwright teams have been developing this expertise across grain, feed, flour, pet food, and oilseed processing facilities for decades — installed equipment that is aligned to manufacturer tolerance performs better, lasts longer, and requires less unplanned maintenance.

Grain Handling Equipment Installation

Complete installation of bucket elevators, belt conveyors, drag conveyors, belt-bucket elevators, and grain distributor systems. Our millwrights install these systems to manufacturer specifications, with precise leveling, alignment, and tensioning that ensures long service life and minimizes maintenance.

Pellet Mill & Feed Processing Equipment

Installation, alignment, and startup support for pellet mills, conditioners, coolers, crumblers, and screening equipment from industry-leading manufacturers. Our millwrights have extensive experience with the major feed processing equipment brands used in commercial feed manufacturing.

Flour Mill & Grain Milling Equipment

Precision installation of roller mills, plansifters, purifiers, degerminators, and pneumatic conveying systems for flour mills, corn milling facilities, and dry grain milling operations. Roller mill alignment and sifter balance directly affect milling efficiency and product quality.

Pet Food & Oilseed Processing Equipment

Installation and commissioning of extruders, dryers, coating systems, solvent extractors, DTDC columns, and related processing equipment for pet food manufacturing and oilseed processing facilities. Precision millwright work in these applications directly affects food safety outcomes and product quality.

Grain Dryer Installation

Setting, leveling, and commissioning of continuous flow and batch grain dryers for corn, soybeans, wheat, and specialty crops. We coordinate dryer installation with the process piping, electrical, and controls scopes for efficient, complete commissioning.

Bulk Material Handling Systems

Installation of complete bulk material handling systems including receiving equipment, conveying systems, transfer points, and storage interface equipment. Our team manages the interface between civil structures and mechanical equipment for clean, code-compliant installations.

Why Equipment Installation Quality Defines Performance

The difference between a poorly installed pellet mill and a precisely installed one isn’t visible — until production starts. Then it’s measured in downtime, die wear, and maintenance cost every single day.

Industrial process equipment operates at high speeds, under heavy loads, and in demanding environments. A bucket elevator that isn’t plumb will wear its bearings unevenly and shimmy itself out of alignment. A pellet mill whose main shaft isn’t precisely aligned with its drive system will run hot, wear prematurely, and require early replacement. A conveyor that isn’t properly tensioned will slip, slip, and damage its belt.

Todd & Sargent’s millwrights install equipment to manufacturer tolerances using precision laser alignment tools, precision leveling instruments, and decades of experience reading equipment manuals and installation drawings. We don’t guess — we measure, verify, and document every critical parameter.

Precision laser alignment for all rotating equipment drive systems

Digital level and plumb verification for all vertical structures

Torque-to-spec fastener installation on critical connections

Grouting to manufacturer requirements for baseplate stability

Pre-operational run-in and vibration checks before commissioning

Documentation of all installation measurements and alignment data

Coordination with equipment manufacturer startup representatives

Handover documentation including as-built installation records

90+

Years in Operation

300+

Projects Completed

Hundreds

Projects Completed

2

Countries Served

Why Todd & Sargent

The Design-Build Contractor That Knows Your Industry

Self-performing general contractor with specialized crews in slipform concrete, structural steel, mechanical installation, and civil construction — the trades that matter most on agri-industrial projects.

Deep Industry Knowledge

Self-performing general contractor with specialized crews in slipform concrete, structural steel, mechanical installation, and civil construction — the trades that matter most on agri-industrial projects.

Integrated Team Advantage

When engineers, designers, project managers, estimators, and field crews are all on the same team, information flows faster, problems are solved earlier, and decisions are made with full cost and schedule awareness. No gaps between designer and builder.

Self-Performance Quality

We self-perform the critical trades — slipform concrete, structural steel, mechanical equipment installation, and site work. This means direct control over quality, safety, and schedule at the work face.

Proven Track Record

Hundreds of completed projects across grain storage, feed manufacturing plants, flour mills, pet food facilities, oilseed processing plants, ethanol facilities, and other industrial complexes. Our portfolio is the proof that our process works.

Financial Strength

As a licensed and insured construction contractor, Todd & Sargent provides owners with the financial stability and contractual security their lenders and boards require.

Safety-First Culture

Our low Experience Modification Rate (EMR) is the product of a genuine safety culture — daily pre-task planning, dedicated safety professionals, OSHA-trained superintendents, and a zero-compromise attitude toward jobsite safety.

Ready to Discuss Your Project?

Our team of agri-industrial construction specialists is ready to bring your facility from concept to completion — on time, on budget, and to your exact specifications.

Mark Olesen

Mark Olesen

Chief Operating Officer

Mark Olesen is responsible for overseeing company operations, including developing and elevating our people, teams, and processes to take the best way T&S does things and engrain them into everything we do. He has over 45 years of commercial and industrial construction experience, serving in operations leadership and executive roles for over 30 years and as an advisor to construction contracting organizations since 2018. Mark has a bachelor’s degree in industrial construction management from Colorado State University. He has been an active member of Associated Builders and Contractors and Associated General Contractors throughout his career.

Karl Kratzke

Karl Kratzke

Director of Industrial Projects

As the Director of Industrial Projects at Todd & Sargent, Karl Kratzke leads the development and management of projects within the industrial processing sector. With nearly 20 years of experience, his expertise spans a wide range of markets, including oilseed, biofuels, biochemicals, liquid processing, food ingredients, feed ingredients, pharmaceuticals, and pet food. In addition to his background as a General Contractor, Karl spent nearly four years on the leadership team of a major food ingredient company, where he managed capital projects from concept to production, along with plant engineering and facility operations. A member of the Grain Elevator and Processing Society, he is dedicated to advancing industry standards and driving innovation. Karl holds a Bachelor’s degree in Construction Management from Minnesota State University and a Master’s degree in Integrated Food Systems Leadership from the University of Minnesota.

Jon Sargent CEO Todd & Sargent

Jon Sargent

CEO

Jon Sargent provides overall strategic and corporate direction to Todd & Sargent. In his role as CEO, he focuses on setting the company’s vision, leading the company’s leadership team, and ensuring the company lives its values every day. Jon is a member of the Grain Elevator and Processing Society (GEAPS), Construction Management Association, and former board member of Associated Builders & Contractors of Iowa. Jon graduated from the University of Iowa with a B.B.A. in Finance and from the University of Chicago with an M.B.A. in Economics. He is also a member of The Sargent Group, Inc. Board of Directors. Jon has been with Todd & Sargent since 2010.

Brian Watson

Brian Watson

Vice President – Project Management

Brian Watson is responsible for project management at Todd & Sargent, bringing consistent project delivery to our clients. He works closely with our project management teams and clients to ensure project quality, schedules, and budgets are met. Brian is a member of the Grain Elevator and Processing Society and International Association of Operative Millers. Brian graduated from Iowa State University with a degree in Construction Engineering and has been with Todd & Sargent since 2014.

Christie Mohlke

Christie Mohlke

Vice President – People

Christie Mohlke leads all HR functions at Todd & Sargent, such as culture, recruiting, training, compliance, employee onboarding and orientation, employee relations, benefits, and more. She has over 10 years of experience in human resources focusing on operations management. Christie graduated with a B.B.A. in Marketing from Austin Peay State University and a Master’s in Business Administration from Cumberland University. She is a member of the National Society of Human Resource Management and is designated as a Professional of Human Resources.

Lesley Whitten

Lesley Whitten

Director of Operations – Canada

Lesley Whitten oversees all aspects of our Canadian operations, from project management and engineering to field operations to ensure each facility meets client expectations. She has more than 15 years of experience in the construction industry, and she has worked on many new grain elevator builds, large scale elevator and facility upgrades, fertilizer facilities, and canola crushing plants while serving in roles from project coordinator up to project management manager. Lesley holds a CET (Certified Engineering Technologist) and PMP (Project Management Professional) accreditation.

James Bucher

James Bucher

Chief Financial Officer

James Bucher is responsible for Todd & Sargent’s finance, accounting, and information technology functions. He manages the T&S accounting team, banking and insurance relationships, and oversees the annual audits of the company’s financial statements, benefits plans, and insurance programs. James graduated from Iowa State University with a B.A. in Accounting and holds his Certified Public Accountant designation. James has been with Todd & Sargent since 2017.

Pat Taggart

Pat Taggart

Vice President – Field Operations

Pat Taggart is responsible for field operations at Todd & Sargent. His duties include overseeing safety, field construction teams, construction scheduling, and project quality assurance. He also oversees Todd & Sargent’s warehouse team. Pat graduated from Iowa State University with a B.S. in Agriculture Studies. Pat has been with Todd & Sargent since 1983.

Bryan Coussens

Bryan Coussens, P.E.

Vice President – Design & Engineering

Bryan Coussens is responsible for all aspects of Todd & Sargent’s design and engineering function. Bryan manages Todd & Sargent’s team of engineers, drafters, and designers to meet our clients’ complex engineering needs. He provides structural, process, and value engineering for projects in the grain, feed, flour, biofuels, and specialty industries. Bryan also reviews projects for code requirements and compliance. Bryan is a member of the American Concrete Institute and the American Institute of Steel Construction. He graduated from Iowa State University with a B.A. in Civil Engineering. Bryan has been with Todd & Sargent since 1996.

Scott Sylvester

Scott Sylvester

Vice President – Business Development

Scott Sylvester is responsible for developing and maintaining strong client and partner relationships as well as identifying new market opportunities at Todd & Sargent. He has over 20 years serving clients and partners in the Ag and Industrial construction markets. He is an active member with the Iowa Association of Business and Industry and past member of Food Processing Suppliers Association and Iowa Lean Consortium. Scott graduated from the University of Northern Iowa with a General Studies degree, with an emphasis on communications and psychology.

Alex Kerrigan

Alex Kerrigan

Vice President – Project Development

Alex Kerrigan is responsible for project development at Todd & Sargent, bringing ag and industrial projects from concept to reality. Alex works closely with each client’s team to develop successful facility designs and compile comprehensive and competitive cost estimates. Alex is a member of the American Feed Industry Association, Grain Elevator and Processing Society, International Association of Operative Millers, and National Grain and Feed Association. Alex graduated from the University of Notre Dame. Alex has been with Todd & Sargent since 2002.

Rori Bouchard

Rori Bouchard

President – Canada

Rori Bouchard leads our Canada team to fulfilling the company mission and vision and ensures our company lives its values every day. He has more than 15 years of industry experience, with specialized knowledge in all facets of the construction of ag-industrial facilities with experience as a project manager, business development director, and managing director, among other roles. Rori is a member of the Association of Professional Engineers & Geoscientists of Manitoba and Grain Elevator and Processing Society. He graduated from the University of Manitoba with a B.S. in Mechanical Engineering and a minor in Management.

Jon Sargent

Jon Sargent

President & CEO

Jon Sargent provides overall strategic and corporate direction to Todd & Sargent. In his role as President & CEO, he focuses on setting the company’s vision, leading the company’s leadership team, and ensuring the company lives its values every day. Jon is a member of the Grain Elevator and Processing Society (GEAPS), Construction Management Association, and former board member of Associated Builders & Contractors of Iowa. Jon graduated from the University of Iowa with a B.B.A. in Finance and from the University of Chicago with an M.B.A. in Economics. He is also a member of The Sargent Group, Inc. Board of Directors. Jon has been with Todd & Sargent since 2010.